Case Study: How this Midwestern railroad manufacturer achieved $260,000+ in annual savings by switching welding consumables

case-study-01-bg

Located in the sprawling great plains of the Midwest, this reputable rail manufacturer operates three high-volume railcar manufacturing facilities across Missouri and Arizona. In operation since 1988, this manufacturer has grown to employ a large workforce of 1,600 hardworking welders specializing in the construction of hopper and tank cars.

However, the welders frequently reported experiencing technical difficulties with their equipment that was leading to significant downtime and eating into their overall output month-over-month. In efforts to increase corporate efficiencies, the manufacturer looked for a solution.

Read Full Case Study

Sign up for our Monthly Newsletter

Join our community of over 20,000 industry experts and subscribe to our newsletters to receive product announcements and offers.

  • This field is for validation purposes and should be left unchanged.